Installation、Operation Maintenance Manuals——Slanted Seat Tilting Disc Check Valve


Release time:

Aug 27,2025

This document outlines installation, operation, and maintenance considerations for angle-seat check valves across five key areas: valve storage and handling, installation procedures, commissioning and operation, maintenance practices, and fault diagnosis and resolution. Adherence to these guidelines ensures reliable valve performance and extends its service life.

1、Storage and handling of valves

a. Valve storage should be placed in a cool and dry place, do not allow open stacking. There should be moisture-proof, dust-proof measures. Flange surface shall not be placed directly on the ground, should be placed flat on top of the cushion wood to prevent damage to the flange sealing surface, as far as possible, using the original packaging and original protection.

b. Valve handling and lifting, shall not be overturned, upside down check valve; traveling crane lifting weight is greater than the weight of the valve, the sling must have sufficient strength, and tied firmly in the valve lifting hole. Sling angle should be less than 60 °, and lifting process must move smoothly to avoid impact.

c. When handling and installing, there should be enough space for operation, and do not hit the transmission device and valves.

2、Installation of valves

(1) Requirements for piping

a、Pipe flange standards must be compatible with valve flange standards,EN1092-1;

b、The flanges on both sides of the pipe should be kept parallel with a deviation of not more than 2mm;

c、The flange connection should be kept on the same axis, with the center of the screw holes not exceeding 5% of the diameter of the holes, and ensure that the bolts are free to penetrate;

(2)Pre-installation

a、The installer should read this manual in detail before the valve is installed;

b、After opening the valve packing box, the installer should carefully check whether the valve packing list matches the actual goods ;

c、Before installation of the valve, remove its outer packaging, the valve channel for a comprehensive cleaning, inspection, do not allow debris adhering to the channel, the disc of check valve can not open and close  before cleaning;

d、Check the labeling and main dimensions of the valve according to the site conditions.;

e、Before the valve is installed, the fasteners in each part should

be checked to see if there is any looseness, whether there is any abnormality when opening and closing, and whether the valve is flexible in opening and closing;

f、When installing, first check the orientation, the arrow

direction on the valve body should be consistent with the medium flow direction.

g、Before the valve is installed, the disc is in the closed position, and after installation, it should be taken to ensure that the disc does not interfere with the pipeline in the fully open state;

h、This product has self-opening ability, when the horizontal vertical lifting valve, the disc will automatically open a certain angle, this is a normal phenomenon, it does not have to be forced to close when installation, Meanwhile it does not affect the normal opening and closing of the valve after installation, it should be paid attention to the lifting of the valve, you need to fix the disc and the balancer to prevent accidental action of the hammer and the disc to cause personal injury!

i、The location of the space where the valve is to be installed should be large enough for manual operation and maintenance;

(3)The installation process

a、The disc should be in the closed position;

b、Lift the valve to the intended installation position, the sling must have sufficient strength, the sling angle should be less than 60 °, and the lifting process must move smoothly to avoid impact.

c、The direction of flow of the medium should be made to coincide with the direction of the flow direction marking on the valve body;

d、The connecting surface of the flange should be in the correct position, the sealing surface of the flange is perpendicular to the pipeline, and the flange bolt holes should be aligned with the bolt holes of the pipeline and should not be skewed. Make the center line of the valve body and the center line of the pipeline to maintain consistency can be used to pad and lift the way, and then connecting bolts will be used to connect the valve, gasket and pipeline flange together, so that the flange sealing surface and the gasket uniform compression, connecting bolts should be uniformly and symmetrically tightened, which ensures that the flange by the same bolt stress on the flange to be connected;

e、Piping on either side of the valve should be braced.;

(4)Installation Precautions

    a、In addition to this manual, the installation should comply with the current safety, environmental protection and fire safety regulations issued by the relevant countries and authorities;

b、The coaxiality of the centerline of the pipeline on both sides of the valve and the perpendicularity of the flange surface to the centerline of the pipeline should be controlled within the permissible range;

c、Before the valve is embedded, a certain distance is left between the two flanges so that there is no contact between the flanges and the seal;

d、The flange should be tightened to avoid uneven force and should be tightened in symmetrical, cross direction sequence;

e、The piping shall be installed in such a way as to ensure that no additional stresses are placed on the valve and that it is freely centered. The piping shall not be subjected to any additional loads outside the design;

f、Deflection shall not be eliminated by forcible tightening of bolts;

g、Do not rely on the valve to support other heavy objects and do not stand on the valve.

3、Commissioning and operation

(1)Commissioning of the valve

   The sealing ratio is adjusted by adjusting the screws on the disc adjusting lever to achieve sealing.

(2)Valve opening and closing testing

a、After the valve is installed in place on the pipeline, the pipeline should be cleaned of debris, remove iron filings and other impurities near the valve sealing seat to ensure that the sealing surface is clean, and carry out a no-load action test before filling with water, and it should be opened and closed flexibly;

b、When the piping system is flushed and filled with water for pressure testing, the valve butterfly shall be in full open position.;

c、When the pipeline pressure reaches the working pressure value, the opening and closing action test should be opened and closed flexibly.

d、It is prohibited to operate the valve during the strength test to avoid damaging the mechanism.

4、Maintenance

a、During the use of the product should be used to check the conditions of use, whether the bolt is loose, whether the parts have rust and corrosion, whether the valve is stuck and other abnormal phenomena.

b、Keep the medium relatively clean and free of hard solid particles to avoid damage to the sealing surface;

5、Troubleshooting and Handling

Potential malfunction

Causes of Failure

Methods of handling

Leakage from sealing surfaces

1. Dirt and foreign matter trapped in the sealing surface

2. Scratched or worn sealing surfaces

3. The sealing surface closes in an inaccurate position.

1. Remove dirt and foreign matter.

2. Trim or replace valve disc seals

3. Adjustment of balancer position.

Valve shaft leakage

1. Damaged O-ring at valve shaft seal

1. Replace the corresponding position O-ring